Aerial of Goodwin Farrer rooftop solar

Project

Goodwin Rollout

1.5 MW+. ACT. Rooftop. 2019, 2021, 2023, 2025, 2026.

Project record

Capacity
1.5 MW+
Location
ACT
Site type
Rooftop
Installation year
2019, 2021, 2023, 2025, 2026

1.5 MW+ Solar PV Installation across multiple facilities in the ACT. Goodwin Village Ainslie, Crace, Monash and Farrer.

Imagine harnessing the power of sunlight with a 1.5 MW+ Solar PV installation across multiple sites. These robust systems not only deliver substantial energy savings but also have exports enabled that will eventually fill batteries and create resilience for the facilities. With careful routine maintenance and the highest quality componentry, EPC Renewables ensures the longevity on all systems.

Back to Projects

Let's build a smarter, more sustainable future.

Talk to an Expert